The construction process of Geogrid

Jiangsu Hanovo New Material Co.,Ltd | Updated: Jul 13, 2017

Geotechnical Grid construction Process: testing, cleaning down the bearing layer → artificial laying of geogrid → lap, lashing, fixing → paving the upper subgrade soil → roller compaction → testing.

Fiberglass Geogrid in the formation of the lower layer in accordance with the design requirements of the width of the laying, its upper and lower layer of filler without the thorn bad geogrid debris, laying geogrid, will be high intensity perpendicular to the direction of the embankment axis layout, Geogrid horizontal laying. Laying tense, Lahan, to avoid wrinkles, twisting or potholes, geogrid along the longitudinal splicing using lap method, lap width is not less than 30cm, paved with geogrid, the artificial laying of upper packing, timely completion of rolling, to avoid long-term exposure.

Then the mechanical transport material, leveling, rolling, mechanical paving, rolling from both sides to the middle, rolling from both sides to the middle, the compaction degree to maintain the standard requirements.